6
The Railway Gang - Part 2
switches and crossings - the proper procedure for track maintenance.
you should now be in possession of the correct track knowledge and be a fully competent Ganger.
Video Player is loading.
This is a modal window.
The media could not be loaded, either because the server or network failed or because the format is not supported.
Close
ID
9o12ge Copy
License
Unknown
Type
video
Duration
16:39
Date
Aug-22-2024
By
thecleaner (2549.00)